S. 2823

September 17, 2014

Status:

  • September 16, 2014.--Introduced.

S.2823

North American Energy Infrastructure Act (Introduced in Senate - IS)

S 2823 IS

113th CONGRESS
2d Session
S. 2823

To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.

IN THE SENATE OF THE UNITED STATES
September 16, 2014

Mr. HOEVEN (for himself, Mr. DONNELLY, Ms. MURKOWSKI, and Mr. MANCHIN) introduced the following bill; which was read twice and referred to the Committee on Energy and Natural Resources


A BILL

To require approval for the construction, connection, operation, or maintenance of oil or natural gas pipelines or electric transmission facilities at the national boundary of the United States for the import or export of oil, natural gas, or electricity to or from Canada or Mexico, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled,

SECTION 1. SHORT TITLE.

    This Act may be cited as the `North American Energy Infrastructure Act'.

SEC. 2. FINDING.

    Congress finds that the United States should establish a more uniform, transparent, and modern process for the construction, connection, operation, and maintenance of oil and natural gas pipelines and electric transmission facilities for the import and export of oil and natural gas and the transmission of electricity to and from Canada and Mexico, in pursuit of a more secure and efficient North American energy market.

SEC. 3. AUTHORIZATION OF CERTAIN ENERGY INFRASTRUCTURE PROJECTS AT THE NATIONAL BOUNDARY OF THE UNITED STATES.

    (a) Authorization- Except as provided in subsection (c) and section 7, no person may construct, connect, operate, or maintain a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico without obtaining a certificate of crossing for the construction, connection, operation, or maintenance of the cross-border segment under this section.
    (b) Certificate of Crossing-
      (1) REQUIREMENT- Not later than 120 days after final action is taken under the National Environmental Policy Act of 1969 (42 U.S.C. 4321 et seq.) with respect to a cross-border segment for which a request is received under this section, the relevant official identified under paragraph (2), in consultation with appropriate Federal agencies, shall issue a certificate of crossing for the cross-border segment unless the relevant official finds that the construction, connection, operation, or maintenance of the cross-border segment is not in the public interest of the United States.
      (2) RELEVANT OFFICIAL- The relevant official referred to in paragraph (1) is--
        (A) the Secretary of State with respect to oil pipelines; and
        (B) the Secretary of Energy with respect to electric transmission facilities.
      (3) ADDITIONAL REQUIREMENT FOR ELECTRIC TRANSMISSION FACILITIES- In the case of a request for a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment of an electric transmission facility, the Secretary of Energy shall require, as a condition of issuing the certificate of crossing for the request under paragraph (1), that the cross-border segment of the electric transmission facility be constructed, connected, operated, or maintained consistent with all applicable policies and standards of--
        (A) the Electric Reliability Organization and the applicable regional entity; and
        (B) any Regional Transmission Organization or Independent System Operator with operational or functional control over the cross-border segment of the electric transmission facility.
    (c) Exclusions- This section shall not apply to any construction, connection, operation, or maintenance of a cross-border segment of an oil pipeline or electric transmission facility for the import or export of oil or the transmission of electricity to or from Canada or Mexico--
      (1) if the cross-border segment is operating for such import, export, or transmission as of the date of enactment of this Act;
      (2) if a permit described in section 6 for such construction, connection, operation, or maintenance has been issued;
      (3) if a certificate of crossing for such construction, connection, operation, or maintenance has previously been issued under this section; or
      (4) if an application for a permit described in section 6 for such construction, connection, operation, or maintenance is pending on the date of enactment of this Act, until the earlier of--
        (A) the date on which such application is denied; or
        (B) July 1, 2016.
    (d) Effect of Other Laws-
      (1) APPLICATION TO PROJECTS- Nothing in this section or section 7 shall affect the application of any other Federal statute to a project for which a certificate of crossing for the construction, connection, operation, or maintenance of a cross-border segment is sought under this section.
      (2) ENERGY POLICY AND CONSERVATION ACT- Nothing in this section or section 7 shall affect the authority of the President under section 103(a) of the Energy Policy and Conservation Act.

SEC. 4. IMPORTATION OR EXPORTATION OF NATURAL GAS TO CANADA AND MEXICO.

    Section 3(c) of the Natural Gas Act (15 U.S.C. 717b(c)) is amended--
      (1) by striking, `For purposes of subsection (a) of this section' and inserting the following:
      `(1) IN GENERAL- For purposes of subsection (a)'; and
      (2) by adding at the end the following:
      `(2) DEADLINE FOR APPROVAL OF APPLICATIONS RELATING TO CANADA AND MEXICO- In the case of an application for the importation or exportation of natural gas to or from Canada or Mexico, the Commission shall approve the application not later than 30 days after the date of receipt of the application.'.

SEC. 5. TRANSMISSION OF ELECTRIC ENERGY TO CANADA AND MEXICO.

    (a) Repeal of Requirement To Secure Order- Section 202(e) of the Federal Power Act (16 U.S.C. 824a(e)) is repealed.
    (b) Conforming Amendments-
      (1) STATE REGULATIONS- Section 202(f) of the Federal Power Act (16 U.S.C. 824a(f)) is amended by striking `insofar as such State regulation does not conflict with the exercise of the Commission's powers under or relating to subsection 202(e)'.
      (2) SEASONAL DIVERSITY ELECTRICITY EXCHANGE- Section 602(b) of the Public Utility Regulatory Policies Act of 1978 (16 U.S.C. 824a-4(b)) is amended by striking `the Commission has conducted hearings and made the findings required under section 202(e) of the Federal Power Act' and all that follows through the period at the end and inserting `the Secretary has conducted hearings and finds that the proposed transmission facilities would not impair the sufficiency of electric supply within the United States or would not impede or tend to impede the coordination in the public interest of facilities subject to the jurisdiction of the Secretary.'.

SEC. 6. NO PRESIDENTIAL PERMIT REQUIRED.

    No Presidential permit (or similar permit) required under Executive Order No. 13337 (3 U.S.C. 301 note), Executive Order No. 11423 (3 U.S.C. 301 note), section 301 of title 3, United States Code, Executive Order No. 12038, Executive Order No. 10485, or any other Executive order shall be necessary for the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility, or any cross-border segment thereof.

SEC. 7. MODIFICATIONS TO EXISTING PROJECTS.

    No certificate of crossing under section 3, or permit described in section 6, shall be required for a modification to the construction, connection, operation, or maintenance of an oil or natural gas pipeline or electric transmission facility--
      (1) that is operating for the import or export of oil or natural gas or the transmission of electricity to or from Canada or Mexico as of the date of enactment of the Act;
      (2) for which a permit described in section 6 for such construction, connection, operation, or maintenance has been issued; or
      (3) for which a certificate of crossing for the cross-border segment of the pipeline or facility has previously been issued under section 3.

SEC. 8. EFFECTIVE DATE; RULEMAKING DEADLINES.

    (a) Effective Date- Sections 3 through 7, and the amendments made by such sections, shall take effect on July 1, 2015.
    (b) Rulemaking Deadlines- Each relevant official described in section 3(b)(2) shall--
      (1) not later than 180 days after the date of enactment of this Act, publish in the Federal Register notice of a proposed rulemaking to carry out the applicable requirements of section 3; and
      (2) not later than 1 year after the date of enactment of this Act, publish in the Federal Register a final rule to carry out the applicable requirements of section 3.

SEC. 9. DEFINITIONS.

    In this Act--
      (1) the term `cross-border segment' means the portion of an oil or natural gas pipeline or electric transmission facility that is located at the national boundary of the United States with either Canada or Mexico;
      (2) the term `modification' includes a change in ownership, volume expansion, downstream or upstream interconnection, or adjustment to maintain flow (such as a reduction or increase in the number of pump or compressor stations);
      (3) the term `natural gas' has the meaning given that term in section 2 of the Natural Gas Act (15 U.S.C. 717a);
      (4) the term `oil' means petroleum or a petroleum product;
      (5) the terms `Electric Reliability Organization' and `regional entity' have the meanings given those terms in section 215 of the Federal Power Act (16 U.S.C. 824o); and
        (6) the terms `Independent System Operator' and `Regional Transmission Organization' have the meanings given those terms in section 3 of the Federal Power Act (16 U.S.C. 796).